1 Unanswered Topic
Remove Filter | |
Taking an online class, and having a problem between the formula given for future value and the translation into Raptor. The formula given is F = P (1+ (R/4))^4Y. I have it in as: FutureValue = PresentValue*(1+(Rate/4))^4*Year. I have asked the instructor, and am told to look at the order … |
The End.