Brandy_1 0 Newbie Poster

Taking an online class, and having a problem between the formula given for future value and the translation into Raptor. The formula given is F = P (1+ (R/4))^4Y. I have it in as:
FutureValue = PresentValue(1+(Rate/4))^4Year. I have asked the instructor, and am told to look at the order of operations. I am not finding the problem in the order of operations. Please help if you can.