HI,

I have a spec for a golf tournament report. in it it says that to generate a report for less than 200 players the processing time of the report should be within 15 minutes. how can i test this in junt
the uril for the SRS is below (section 4, performance requirment)

http://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&ved=0CGcQFjAA&url=http%3A%2F%2Fcdn.transtutors.com%2FUploadAssignments%2F73133_2_Golf-Tournament-Report-SRS-v1.5.pdf&ei=j4jDT4D4IojE2gXy5tFg&usg=AFQjCNH5m0gWE8FLGCpC8YWCDrQhHqsBhA&sig2=ZM1nnxp3gY9H9gCOewnnXg

Recommended Answers

All 2 Replies

Take time reading before report method is called, take time reading at end of the method, calculate difference

i didn't get it?