vandora 0 Newbie Poster

Hi

I am new to thsi forum and this is my first post. I have a linux box with a test server running an Oracle database. I am now reasdy to move the entire setup to a production boc.

I was wondering what the best way to do this would be. I need to make sure that everything on the production box runs in the same way as the test box. they are both on the same netwrk.
What would be the best way to do this as i need to transfer not just the oracle database but the entire environement.